§ 205.199G Extension of time; Interim and Ancillary Orders.

United States · 10 CFR — Energy · Status: effective

Get this as JSONEmbed this
Cite this
Citation
10 CFR 205.199G, § 205.199G Extension of time; Interim and Ancillary Orders, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/38988
Permanent ID
ys:prov:38988@1
SHA-256
de2dc25de30ef8e0f8a59fd5ac59935489e505c4e311cb528328d9506bdb2de7

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

The Director of the Office of Hearings and Appeals or his designee may permit upon motion any document or submission referred to in this subpart other than appeals to FERC to be amended or withdrawn after it has been filed or to be filed within a time period different from that specified in this subpart. The Director or his designee may upon motion or on his own initiative issue any interim or ancillary Orders, reconsider any determinations, or make any rulings or determinations that are deemed necessary to ensure that the proceedings specified in this subpart are conducted in an appropriate manner and are not unduly delayed.