§ 501.190 Purpose and scope.

United States · 10 CFR — Energy · Status: effective

Get this as JSONEmbed this
Cite this
Citation
10 CFR 501.190, § 501.190 Purpose and scope, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/40034
Permanent ID
ys:prov:40034@1
SHA-256
95e860c6d61c4c8809738ebb58b92bf00f22536141e9626392f9dbbe761b3b2a

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

(a) If a person operates a powerplant covered by any of the prohibitions of titles II, III, or IV of FUA, § 501.191 of this subpart establishes procedures to be followed for the use of minimum amounts of natural gas or petroleum under FUA section 103(a)(15)(B) in order to alleviate or prevent unanticipated equipment outages and emergencies directly affecting the public health, safety, or welfare that would result from electric power outages. (b) Explanatory note: If a person operates a rental boiler as a powerplant covered by any of the prohibitions of titles II, III, or IV of FUA, he may be able to use the provisions of this subpart for the emergency use of natural gas or petroleum.