§ 706.2 Basis and scope.

United States · 10 CFR — Energy · Status: effective

Get this as JSONEmbed this
Cite this
Citation
10 CFR 706.2, § 706.2 Basis and scope, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/40297
Permanent ID
ys:prov:40297@1
SHA-256
5471e19825e600406c35d427aadb55fca7bd5cce72f3eb677233317b2f8364dc

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

The specific policies contained in this part are worked out within the framework of DOE's general objectives for labor-management relations in the DOE program, namely: (a) Wholehearted acceptance by contractors and by labor and its representatives of the moral responsibility inherent in participation in the DOE program; (b) Development of procedures to assure (1) that all participants in the program are loyal to the United States including those whose participation involves the exercise of negotiating and disciplinary authority over bargaining units, and (2) that determination of unit, jurisdiction, and similar questions will not breach security; (c) Continuity of production at vital DOE installations; (d) Consistent with DOE's responsibility under the law, the least possible governmental interference with the efficient management expected from DOE contractors; (e) Minimum interference with the traditional rights and privileges of American labor.