10 U.S.C. § 6275
Limits on construction projects
United States · Title 10 — ARMED FORCES · Status: effective
Cite this
- Citation
- 10 U.S.C. § 6275, Limits on construction projects, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/435203
- Permanent ID
ys:prov:435203@1- SHA-256
91751b899e7c5ba12da8e13259c3dea0db4e5c54829c38e5279ea235b6a0ae1b
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
Except as provided in subsection (b), construction on a construction project which is in support of national security programs of the Department of Energy and was authorized by a DOE national security authorization may not be started, and additional obligations in connection with the project above the total estimated cost may not be incurred, whenever the current estimated cost of the construction project exceeds by more than 25 percent the higher of—
An action described in subsection (a) may be taken if—