30 U.S.C. § 1265
Environmental protection performance standards
United States · Title 30 — MINERAL LANDS AND MINING · Status: effective
Cite this
- Citation
- 30 U.S.C. § 1265, Environmental protection performance standards, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/467214
- Permanent ID
ys:prov:467214@1- SHA-256
08f5a0c888d30eac21ecd33ceade6a01a3c945ccbed97999d6854c760425e61b
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
Any permit issued under any approved State or Federal program pursuant to this chapter to conduct surface coal mining operations shall require that such surface coal mining operations will meet all applicable performance standards of this chapter, and such other requirements as the regulatory authority shall promulgate.
General performance standards shall be applicable to all surface coal mining and reclamation operations and shall require the operation as a minimum to—
for all prime farm lands as identified in section 1257(b)(16) of this title to be mined and reclaimed, specifications for soil removal, storage, replacement, and reconstruction shall be established by the Secretary of Agriculture, and the operator shall, as a minimum, be required to—
create, if authorized in the approved mining and reclamation plan and permit, permanent impoundments of water on mining sites as part of reclamation activities only when it is adequately demonstrated that—
minimize the disturbances to the prevailing hydrologic balance at the mine-site and in associated offsite areas and to the quality and quantity of water in surface and ground water systems both during and after surface coal mining operations and during reclamation by—
avoiding acid or other toxic mine drainage by such measures as, but not limited to—
insure that explosives are used only in accordance with existing State and Federal law and the regulations promulgated by the regulatory authority, which shall include provisions to—
insure that all reclamation efforts proceed in an environmentally sound manner and as contemporaneously as practicable with the surface coal mining operations: Provided, however, That where the applicant proposes to combine surface mining operations with underground mining operations to assure maximum practical recovery of the mineral resources, the regulatory authority may grant a variance for specific areas within the reclamation plan from the requirement that reclamation efforts proceed as contemporaneously as practicable to permit underground mining operations prior to reclamation:
if the regulatory authority finds in writing that:
place all excess spoil material resulting from coal surface mining and reclamation activities in such a manner that—
In cases where an industrial, commercial, agricultural, residential or public facility (including recreational facilities) use is proposed or 66 So in original. Probably should be “for”. the postmining use of the affected land, the regulatory authority may grant a permit for a surface mining operation of the nature described in subsection (c)(2) where—
the applicant presents specific plans for the proposed postmining land use and appropriate assurances that such use will be—
In granting any permit pursuant to this subsection the regulatory authority shall require that—
The following performance standards shall be applicable to steep-slope surface coal mining and shall be in addition to those general performance standards required by this section: Provided, however, That the provisions of this subsection (d) shall not apply to those situations in which an operator is mining on flat or gently rolling terrain, on which an occasional steep slope is encountered through which the mining operation is to proceed, leaving a plain or predominantly flat area or where an operator is in compliance with provisions of subsection (c) hereof:
The Secretary, with the written concurrence of the Chief of Engineers, shall establish within one hundred and thirty-five days from August 3, 1977, standards and criteria regulating the design, location, construction, operation, maintenance, enlargement, modification, removal, and abandonment of new and existing coal mine waste piles referred to in subsection (b)(13) and section 1266(b)(5) of this title. Such standards and criteria shall conform to the standards and criteria used by the Chief of Engineers to insure that flood control structures are safe and effectively perform their intended function. In addition to engineering and other technical specifications the standards and criteria developed pursuant to this subsection must include provisions for: review and approval of plans and specifications prior to construction, enlargement, modification, removal, or abandonment; performance of periodic inspections during construction; issuance of certificates of approval upon completion of construction; performance of periodic safety inspections; and issuance of notices for required remedial or maintenance work.
Legislative history
The public laws that enacted or amended this section. Tallies are for the whole bill as it passed each chamber — often an omnibus covering far more than this provision — not a vote on this section alone.
- Surface Mining Control and Reclamation Act of 1977House: no recorded tallySenate: no recorded tally
- A joint resolution making continuing appropriations for the fiscal year 1987, and for other purposes.House: no recorded tallySenate: no recorded tally
- Energy Policy Act of 1992