yourstate.us
33 U.S.C. § 515

Contracts for project; guaranty of cost

United States · Title 33 — NAVIGATION AND NAVIGABLE WATERS · Status: effective

Get this as JSONEmbed this
Cite this
Citation
33 U.S.C. § 515, Contracts for project; guaranty of cost, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/468385
Permanent ID
ys:prov:468385@1
SHA-256
dded250fd8b0e4f5ca319d80d7c42f9b6891cb8b6d46407489f897fb5c7bebca

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

After approval of such general plans and specifications by the Secretary, and after notification of such approval, the bridge owner shall, in such manner and within such times as the Secretary may prescribe, take bids for the alteration of such bridge in accordance with such general plans and specifications. All bids, including any bid for all or part of the project submitted by the bridge owner, shall be submitted to the Secretary, together with a recommendation by the bridge owner as to the most competent bid or bids, and at the same time the bridge owner shall submit to the Secretary a written guaranty that the total cost of the project, including the cost of such work as is to be performed by the bridge owner and not included in the work to be performed by contract, shall not exceed the sum stated in said guaranty. The Secretary may direct the bridge owner to reject all bids and to take new bids, or may authorize the bridge owner to proceed with the project, by contract, or partly by contract and partly by the bridge owner, or wholly by the bridge owner. Upon such authorization and fixing of the proportionate shares of the cost as provided in section 516 of this title, the bridge owner shall, within a reasonable time to be prescribed by the Secretary, proceed with the work of alteration; and the cost thereof shall be borne by the United States and by the bridge owner, as provided in sections 516 and 517 of this title: Provided, That where funds have been appropriated for part only of a project, the bridge owner may take bids for part only of the work. In the event the bridge owner proceeds with the alteration through the taking of successive partial bids, the bridge owner shall, if required by the Secretary, submit a revised guaranty of cost after bids are accepted for successive parts of the work.

Legislative history

We haven't linked the enacting public law for this provision yet. That means it is missing from our records, not that no law enacted it.