yourstate.us
33 U.S.C. § 702a–2

Abandonment of Boeuf Floodway

United States · Title 33 — NAVIGATION AND NAVIGABLE WATERS · Status: effective

Get this as JSONEmbed this
Cite this
Citation
33 U.S.C. § 702a–2, Abandonment of Boeuf Floodway, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/468663
Permanent ID
ys:prov:468663@1
SHA-256
71c25073b127c947b1f9ee36abe909356accdf454ff970dfd42fac9103450dfe

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

The Boeuf Floodway, authorized by the provisions adopted in section 702a of this title, shall be abandoned as soon as the Eudora Floodway, provided for in Flood Control Committee Document Numbered 1, Seventy-fourth Congress, first session, is in operative condition and the back protection levee recommended in said document, extending north from the head of the Eudora Floodway, shall have been constructed.

Legislative history

We haven't linked the enacting public law for this provision yet. That means it is missing from our records, not that no law enacted it.