33 U.S.C. § 2211

Harbors

United States · Title 33 — NAVIGATION AND NAVIGABLE WATERS · Status: effective

Get this as JSONEmbed this
Cite this
Citation
33 U.S.C. § 2211, Harbors, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/469278
Permanent ID
ys:prov:469278@1
SHA-256
757b9c0f7373c1735d72e104e86b40b1d73cb4a55d0ddb9f3582c2070c4624db

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

The non-Federal interests for a navigation project for a harbor or inland harbor, or any separable element thereof, on which a contract for physical construction has not been awarded before June 10, 2014, shall pay, during the period of construction of the project, the following costs associated with general navigation features: The non-Federal interests for a project to which paragraph (1) applies shall pay an additional 10 percent of the cost of the general navigation features of the project in cash over a period not to exceed 30 years, at an interest rate determined pursuant to section 2216 of this title. The value of lands, easements, rights-of-way, and relocations provided under paragraph (3) and the costs of relocations borne by the non-Federal interests under paragraph (4) shall be credited toward the payment required under this paragraph. Except as provided under section 2283(c) of this title, the non-Federal interests for a project to which paragraph (1) applies shall provide the lands, easements, rights-of-way, and relocations (other than utility relocations under paragraph (4)) necessary for the project, including any lands, easements, rights-of-way, and relocations (other than utility relocations accomplished under paragraph (4)) that are necessary for dredged material disposal facilities. The non-Federal interests for a project to which paragraph (1) applies shall perform or assure the performance of all relocations of utilities necessary to carry out the project, except that in the case of a project for a deep-draft harbor and in the case of a project constructed by non-Federal interests under section 2232 of this title, one-half of the cost of each such relocation shall be borne by the owner of the facility being relocated and one-half of the cost of each such relocation shall be borne by the non-Federal interests. In this subsection, the term “general navigation features” includes constructed land-based and aquatic dredged material disposal facilities that are necessary for the disposal of dredged material required for project construction and for which a contract for construction has not been awarded on or before October 12, 1996. The Federal share of the cost of operation and maintenance of each navigation project for a harbor or inland harbor constructed by the Secretary pursuant to this Act or any other law approved after November 17, 1986, shall be 100 percent, except that in the case of a deep-draft harbor, the non-Federal interests shall be responsible for an amount equal to 50 percent of the excess of the cost of the operation and maintenance of such project over the cost which the Secretary determines would be incurred for operation and maintenance of such project if such project had a depth of 55 feet. The Federal share of the cost of constructing land-based and aquatic dredged material disposal facilities that are necessary for the disposal of dredged material required for the operation and maintenance of a project and for which a contract for construction has not been awarded on or before October 12, 1996, shall be determined in accordance with subsection (a). The Federal share of operating and maintaining such facilities shall be determined in accordance with paragraph (1). Costs of constructing projects or measures for the prevention or mitigation of erosion or shoaling damages attributable to Federal navigation works shall be shared in the same proportion as the cost sharing provisions applicable to the project causing such erosion or shoaling. The non-Federal interests for the project causing the erosion or shoaling shall agree to operate and maintain such measures. The amount of any non-Federal share of the cost of any navigation project for a harbor or inland harbor shall be paid to the Secretary. Amounts required to be paid during construction shall be paid on an annual basis during the period of construction, beginning not later than one year after construction is initiated. Before initiation of construction of a project to which this section applies, the Secretary and the non-Federal interests shall enter into a cooperative agreement according to the provisions of section 1962d–5b of title 42. The non-Federal interests shall agree to— The Secretary shall ensure, to the extent practicable, that—

Legislative history

The public laws that enacted or amended this section. Tallies are for the whole bill as it passed each chamber — often an omnibus covering far more than this provision — not a vote on this section alone.

  • Enacted byPub. L. 99-662(H.R. 6)1986-11-17
    Water Resources Development Act of 1986
    House: no recorded tallySenate: no recorded tally
  • Amended byPub. L. 100-676(S. 2100)1988-11-17
    Water Resources Development Act of 1988
    House: no recorded tallySenate: no recorded tally
  • Amended byPub. L. 102-580(H.R. 6167)1992-10-31
    Water Resources Development Act of 1992
    House: no recorded tallySenate: no recorded tally
  • Amended byPub. L. 104-303(S. 640)1996-10-12
    Water Resources Development Act of 1996
    House: no recorded tallySenate: no recorded tally
  • Amended byPub. L. 113-121(H.R. 3080)2014-06-10
    Water Resources Reform and Development Act of 2014
  • Amended byPub. L. 114-322(S. 612)2016-12-16
    WIIN Act
    House: 360–61Senate: no recorded tally
  • Amended byPub. L. 118-272(S. 4367)2025-01-04
    Thomas R. Carper Water Resources Development Act of 2024
    House: 399–18Senate: no recorded tally