33 U.S.C. § 2214

General credit for flood control

United States · Title 33 — NAVIGATION AND NAVIGABLE WATERS · Status: effective

Get this as JSONEmbed this
Cite this
Citation
33 U.S.C. § 2214, General credit for flood control, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/469283
Permanent ID
ys:prov:469283@1
SHA-256
649f1637b9eb2e7cb63fce5c00d0c51008467869422895281d350c5f693f49de

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

Within one year after November 17, 1986, the Secretary shall issue guidelines to carry out this section, consistent with the principles and guidelines on project formulation. The guidelines shall include criteria for determining whether work carried out by non-Federal interests is compatible with a project for flood control and procedures for making such determinations. The guidelines under this section shall be promulgated after notice in the Federal Register and opportunity for comment. The guidelines established under subsection (a) shall provide for the Secretary to consider, in analyzing the costs and benefits of a proposed project for flood control, the costs and benefits produced by any flood control work carried out by non-Federal interests that the Secretary determines to be compatible with the project. For purposes of the preceding sentence the Secretary may consider only work carried out after the date which is 5 years before the first obligation of funds for the reconnaissance study for such project. In no case may work which was carried out more than 5 years before November 17, 1986, be considered under this subsection, unless otherwise provided in this Act. The guidelines established under subsection (a) shall provide for crediting the cost of work carried out by the non-Federal interests against the non-Federal share of the cost of an authorized project for flood control as follows: The Secretary shall consider, under subsections (b) and (c), work carried out before November 17, 1986, by non-Federal interests on a project for flood control, if the non-Federal interests apply to the Secretary for consideration of such work not later than March 31, 1987. The Secretary shall make determinations under subsections (b) and (c) with respect to such work not later than 6 months after guidelines are issued under subsection (a). The Secretary shall consider work carried out after November 17, 1986, by non-Federal interests on a project for flood control under subsections (b) and (c) in accordance with the guidelines issued under subsection (a). The guidelines shall require prior approval by the Secretary of any flood control work carried out after November 17, 1986, in order to be considered under this section, taking into account the economic and environmental feasibility of the project. Any flood control work included as part of the non-Federal share of the cost of a project under this section shall not be subject to the limitation contained in the last sentence of section 1962d–5a(a) of title 42. Nothing in this section affects the requirement of section 2213(a)(1)(A) of this title.

Legislative history

The public laws that enacted or amended this section. Tallies are for the whole bill as it passed each chamber — often an omnibus covering far more than this provision — not a vote on this section alone.

  • Enacted byPub. L. 99-662(H.R. 6)1986-11-17
    Water Resources Development Act of 1986
    House: no recorded tallySenate: no recorded tally