yourstate.us
33 U.S.C. § 2267b

Post-disaster watershed assessments

United States · Title 33 — NAVIGATION AND NAVIGABLE WATERS · Status: effective

Get this as JSONEmbed this
Cite this
Citation
33 U.S.C. § 2267b, Post-disaster watershed assessments, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/469334
Permanent ID
ys:prov:469334@1
SHA-256
23d30e3d1588bc90d8bf472d42fa4f2a6567c086d1367a9611c9af2a86f44f0c

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

In an area that the President has declared a major disaster in accordance with section 5170 of title 42, the Secretary may carry out a watershed assessment to identify, to the maximum extent practicable, specific flood risk reduction, hurricane and storm damage reduction, ecosystem restoration, or navigation project recommendations that will help to rehabilitate and improve the resiliency of damaged infrastructure and natural resources to reduce risks to human life and property from future natural disasters. A watershed assessment carried out paragraph 11 So in original. Probably should be preceded by “under”. (1) may identify existing projects being carried out under 1 or more of the authorities referred to in subsection (b)(1). In carrying out a watershed assessment under paragraph (1), the Secretary shall use all existing watershed assessments and related information developed by the Secretary or other Federal, State, or local entities. The Secretary may carry out projects identified under a watershed assessment under subsection (a) in accordance with the criteria for projects carried out under one of the following authorities: For each project that does not meet the criteria under paragraph (1), the Secretary shall include a recommendation relating to the project in the annual report submitted to Congress by the Secretary in accordance with section 2282d of this title. In carrying out a project under paragraph (1), the Secretary shall— All requirements applicable to a project under the Acts described in subsection (b) shall apply to the project. A watershed assessment under subsection (a) shall be initiated not later than 2 years after the date on which the major disaster declaration is issued. For any major disaster declared in a territory of the United States before October 23, 2018, all activities in the territory carried out or undertaken pursuant to the authorities described in this section shall be conducted at full Federal expense unless the President determines that the territory has the ability to pay the cost share for an assessment under this section without the use of loans. In this subsection, the term “territory of the United States” means an insular area specified in section 2310(a)(1) of this title.

Legislative history

The public laws that enacted or amended this section. Tallies are for the whole bill as it passed each chamber — often an omnibus covering far more than this provision — not a vote on this section alone.

  • Enacted byPub. L. 113-121(H.R. 3080)2014-06-10
    Water Resources Reform and Development Act of 2014
  • Amended byPub. L. 115-270(S. 3021)2018-10-23
    America's Water Infrastructure Act of 2018
    House: no recorded tallySenate: no recorded tally