33 U.S.C. § 2346
Project administration
United States · Title 33 — NAVIGATION AND NAVIGABLE WATERS · Status: effective
Cite this
- Citation
- 33 U.S.C. § 2346, Project administration, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/469463
- Permanent ID
ys:prov:469463@1- SHA-256
cb2abbc17144f8b8dd040e5b989dc09ea4508f1a326e3c3969469a18acf879ea
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
The Secretary shall assign a unique tracking number to each water resources project under the jurisdiction of the Secretary to be used by each Federal agency throughout the life of the project.
The Secretary shall provide to the Library of Congress a copy of each final feasibility study, final environmental impact statement, final reevaluation report, final post-authorization change report, record of decision, and report to Congress prepared by the Corps of Engineers.
Each document described in paragraph (1) shall be made available to the public, and an electronic copy of each document shall be made permanently available to the public through the Internet.
Legislative history
The public laws that enacted or amended this section. Tallies are for the whole bill as it passed each chamber — often an omnibus covering far more than this provision — not a vote on this section alone.
- Water Resources Development Act of 2007
- WIIN ActHouse: 360–61Senate: no recorded tally