yourstate.us
43 U.S.C. § 422d

Contents of proposals

United States · Title 43 — PUBLIC LANDS · Status: effective

Get this as JSONEmbed this
Cite this
Citation
43 U.S.C. § 422d, Contents of proposals, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/485489
Permanent ID
ys:prov:485489@1
SHA-256
4cacc34a6c65771faa21edeffdb3a80d3ff59130a29eed7053b57b1d272db2b7

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

Any proposal with respect to the construction of a project which has not theretofore been authorized for construction under the Federal reclamation laws shall set forth, among other things, a plan and estimated cost in detail comparable to those included in preauthorization reports required for a Federal reclamation project; shall have been submitted for review by the States of the drainage basin in which the project is located in like manner as provided in section 701–1(c) of title 33, except that the review may be limited to the State or States in which the project is located if the proposal is one solely for rehabilitation and betterment of an existing project; and shall include a proposed allocation of capital costs to functions such that costs for facilities used for a single purpose shall be allocated to that purpose and costs for facilities used for more than one purpose shall be so allocated among the purposes served that each purpose will share equitably in the costs of such joint facilities. The costs of means and measures to prevent loss of and damage to fish and wildlife resources shall be considered as project costs and allocated as may be appropriate among project functions. At such time as a project is found by the Secretary and the Governor of the State in which it is located (or an appropriate State agency designated by him) to be financially feasible, is determined by the Secretary to constitute a reasonable risk under the provisions of this subchapter, and is approved by the Secretary, such findings and approval shall be transmitted to the Congress. Each project proposal transmitted by the Secretary to the Congress shall include a certification by the Secretary that an adequate soil survey and land classification has been made, or that the successful irrigability of those lands and their susceptibility to sustained production of agricultural crops by means of irrigation has been demonstrated in practice. Such proposal shall also include an investigation of soil characteristics which might result in toxic or hazardous irrigation return flows. The Secretary, at the time of submitting the project proposal to Congress or at the time of his determination that the requested project constitutes a reasonable risk under the provisions of this subchapter, may reserve from use or disposition inimical to the project any lands and interests in land owned by the United States which are within his administrative jurisdiction and subject to disposition by him and which are required for use by the project. Any such reservation shall expire at the end of two years unless the contract provided for in section 422e of this title shall have been executed. At the time of his submitting the project proposal to the Congress, or at any subsequent time prior to completion of construction of the project, including projects heretofore approved, the Secretary may increase the amount of the requested loan and/or grant to an amount within the maximum allowed by section 422e(a) of this title, as amended by Pub. L. 94–181, to compensate for increases in construction costs due to price escalation. No appropriation shall be made for financial participation in any such project prior to sixty calendar days (which sixty days, however, shall not include days on which either the House of Representatives or the Senate is not in session because of an adjournment of more than three calendar days to a day certain) from the date on which the Secretary’s findings and approval are submitted to the Congress and then only if, within said sixty days, neither the Committee on Natural Resources of the House of Representatives nor the Committee on Energy and Natural Resources of the Senate disapproves the project proposal by committee resolution. The provisions of this subsection (e) shall not be applicable to proposals made under section 422f of this title. The Secretary shall give due consideration to financial feasibility, emergency, or urgent need for the project. All project works and facilities constructed under this subchapter shall remain under the jurisdiction and control of the local contracting organization subject to the terms of the repayment contract.

Legislative history

The public laws that enacted or amended this section. Tallies are for the whole bill as it passed each chamber — often an omnibus covering far more than this provision — not a vote on this section alone. The law that originally enacted this section predates the public laws loaded here, so only later amendments are listed.

  • Amended byPub. L. 94-181(H.R. 6874)1975-12-27
    A bill to amend the Small Reclamation Projects Act of 1956, as amended.
    House: no recorded tallySenate: no recorded tally
  • Amended byPub. L. 99-546(H.R. 3113)1986-10-27
    A bill providing for the coordinated operation of the Central Valley project and the State water project in California.
    House: no recorded tallySenate: no recorded tally
  • Amended byPub. L. 103-437(H.R. 4777)1994-11-02
    To make technical improvements in the United States Code by amending provisions to reflect the current names of congressional committees.
    House: no recorded tallySenate: no recorded tally