43 U.S.C. § 1524
Water furnished from Central Arizona Project
United States · Title 43 — PUBLIC LANDS · Status: effective
Cite this
- Citation
- 43 U.S.C. § 1524, Water furnished from Central Arizona Project, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/486307
- Permanent ID
ys:prov:486307@1- SHA-256
057721b62d23a8720350175b8d218bf1ac744af44369b8f3bf09048807d291b7
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
Unless and until otherwise provided by Congress, water from the Central Arizona Project shall not be made available directly or indirectly for the irrigation of lands not having a recent irrigation history as determined by the Secretary, except in the case of Indian lands, national wildlife refuges, and, with the approval of the Secretary, State-administered wildlife management areas.
Each contract under which water is provided under the Central Arizona Project shall require that (1) there be in effect measures, adequate in the judgment of the Secretary, to control expansion of irrigation from aquifers affected by the irrigation in the contract service area;
(2) the canals and distribution systems through which water is conveyed after its delivery by the United States to the contractors shall be provided and maintained with linings adequate in his judgment to prevent excessive conveyance losses; and (3) [Repealed. Pub. L. 102–575, title XXXVII, § 3710(k), Oct. 30, 1992, 106 Stat. 4751]. Such contracts shall be subordinate at all times to the satisfaction of all existing contracts between the Secretary and users in Arizona heretofore made pursuant to the Boulder Canyon Project Act (45 Stat. 1057) [43 U.S.C. 617 et seq.].
The Secretary may require in any contract under which water is provided from the Central Arizona Project that the contractor agree to accept main stream water in exchange for or in replacement of existing supplies from sources other than the main stream. The Secretary shall so require in the case of users in Arizona who also use water from the Gila River system to the extent necessary to make available to users of water from the Gila River system in New Mexico additional quantities of water as provided in and under the conditions specified in subsection (f) of this section: Provided, That such exchanges and replacements shall be accomplished without economic injury or cost to such Arizona contractors.
In times of shortage or reduction of main stream Colorado River water for the Central Arizona Project, as determined by the Secretary, users which have yielded water from other sources in exchange for main stream water supplied by that project shall have a first priority to receive main stream water, as against other users supplied by that project which have not so yielded water from other sources, but only in quantities adequate to replace the water so yielded.
Legislative history
The public laws that enacted or amended this section. Tallies are for the whole bill as it passed each chamber — often an omnibus covering far more than this provision — not a vote on this section alone. The law that originally enacted this section predates the public laws loaded here, so only later amendments are listed.
- Reclamation Projects Authorization and Adjustment Act of 1992
- Arizona Water Settlements ActHouse: no recorded tallySenate: no recorded tally