Tex. Utilities Code § 44.007

PLAN FOR ALL HAZARDS RESILIENCE

Texas · Texas Utilities Code · Status: effective

Get this as JSONEmbed this
Cite this
Citation
Tex. Utilities Code § 44.007, PLAN FOR ALL HAZARDS RESILIENCE, Texas, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/577017
Permanent ID
ys:prov:577017@1
SHA-256
469577024b08c95fb1246fb11b622cb75b4e1afebe276aa420adf726a6e6aaac

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

(a) Not later than December 1, 2026, the security commission shall prepare and deliver to the legislature a plan for protecting critical infrastructure from all hazards, including a catastrophic loss of power in the state. (b) The plan must include: (1) any weatherization recommendations in addition to requirements established under Section 35.0021 necessary to prevent outages of critical infrastructure from extreme cold weather events, an analysis of whether these recommendations would induce cyber vulnerabilities, and an analysis of the associated costs for these recommendations; (2) recommendations for installing, replacing, or upgrading industrial control systems and associated networks, or the use of compensating controls or procedures, in critical facilities to address cyber vulnerabilities; (3) recommendations for installing, replacing, or upgrading extra high-voltage power transformers and supervisory control and data acquisition systems to withstand 100 kilovolts/meter E1 electromagnetic pulses and 85 volts/kilometer E3 electromagnetic pulses; (4) a timeline for making improvements to critical infrastructure to meet resilience standards recommended by the security commission under Section 44.005; (5) long-term resilience recommendations for supporting industries, including: (A) communications; (B) food supply; (C) fuel supply; (D) health care; (E) nuclear reactors, materials, and waste; (F) transportation; and (G) water and sewer services; and (6) any additional recommendations considered necessary by the security commission. (c) The security commission may consult with the Private Sector Advisory Council in developing the plan.