yourstate.us
14 CFR 151.51

§ 151.51 Performance of construction work: Sponsor force account.

United States · 14 CFR — Aeronautics and Space · Status: effective

Get this as JSONEmbed this
Cite this
Citation
14 CFR 151.51, § 151.51 Performance of construction work: Sponsor force account, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/57822
Permanent ID
ys:prov:57822@1
SHA-256
7240455bf07c8cc38c9e189aa5c0ceecb76c74e62523d0c5ec9b61d63d9daa2c

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

(a) Before undertaking any force account construction work, the sponsor (or any public agency acting as agent for the sponsor) must obtain the written consent of the Administrator through the Area Manager. In requesting that consent, the sponsor must submit— (1) Adequate plans and specifications showing the nature and extent of the construction work to be performed under that force account; (2) A schedule of the proposed construction and of the construction equipment that will be available for the project; (3) Assurance that adequate labor, material, equipment, engineering personnel, as well as supervisory and inspection personnel as required by § 151.45(f), will be provided; and (4) A detailed estimate of the cost of the work, broken down for each class of costs involved, such as labor, materials, rental of equipment, and other pertinent items of cost. (b) [Reserved]

Legislative history

This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.