14 CFR 151.125

§ 151.125 Allowable advance planning costs.

United States · 14 CFR — Aeronautics and Space · Status: effective

Get this as JSONEmbed this
Cite this
Citation
14 CFR 151.125, § 151.125 Allowable advance planning costs, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/57860
Permanent ID
ys:prov:57860@1
SHA-256
e3f4f4687864e9053ef0e2f7cd33ad35bf0b62ba58f95eb97fd17492f1cccd41

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

(a) The United States' share of the allowable costs of an advance planning proposal is stated in the advance planning grant agreement, but is not more than 50 percent of the total cost of the necessary and reasonable planning and engineering services. (b) The allowable advance planning costs consist of planning and engineering expenses necessarily incurred in effecting the advance planning proposal. Allowable cost items include— (1) Location surveys, such as preliminary topographic and soil exploration; (2) Site evaluation; (3) Preliminary engineering, such as stage construction outlines, cost estimates, and cost/benefit evaluation reports; (4) Contract drawings and specifications; (5) Testing; and (6) Incidental costs incurred to accomplish the proposal, that would not have been incurred otherwise. (c) To qualify as allowable, the advance planning costs paid or incurred by the sponsor must be— (1) Reasonably necessary and directly related to the planning or engineering included in the proposal as approved by FAA; (2) Reasonable in amount; and (3) Verified by sufficient evidence.

Legislative history

This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.