Tex. Water Code § 28.106
ELIGIBILITY OF PROJECTS FOR GRANTS; PRIORITIZATION
Texas · Texas Water Code · Status: effective
Cite this
- Citation
- Tex. Water Code § 28.106, ELIGIBILITY OF PROJECTS FOR GRANTS; PRIORITIZATION, Texas, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/580165
- Permanent ID
ys:prov:580165@1- SHA-256
b999c32f1877e7524b9debcb659a39899b3bd947a29647416cab3499e2df342c
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
(a) To be eligible for a grant for a project, a district must:
(1) demonstrate that the project includes a leaking water well:
(A) that:
(i) is located within 2,000 feet of a drinking water well, a water well for livestock or irrigation, or a sensitive wildlife area; or
(ii) has seasonal or annual flow to the surface, or a hydrological connection to surface water, including a waterway, intermittent stream, or springs system; and
(B) of which:
(i) the plug, casing, completion interval, or general integrity is known by the district to be deficient; or
(ii) the completion interval is sufficiently proximate to other known intervals or pressurized zones with high concentrations of salinity, chlorides, sulfides, or other hazardous or toxic components;
(2) obtain any necessary approval from a surface owner for access to the property where the leaking water well is located; and
(3) as necessary and subject to Subsection (b), engage in a bid process to select and hire a contractor or subcontractor to perform the work.
(b) Notwithstanding any other law, a contract for work on a project for which a grant is provided under the program:
(1) must be awarded to a contractor or subcontractor selected from a list of approved well pluggers maintained by the Railroad Commission of Texas; and
(2) may be awarded to the contractor or subcontractor whose bid or proposal the recipient of the grant determines provides the best value for the recipient based on the selection criteria published by the recipient.
(c) The commission by rule shall establish criteria for prioritizing projects eligible to receive a grant under the program.