yourstate.us
14 CFR 171.25

§ 171.25 Minimum requirements for approval.

United States · 14 CFR — Aeronautics and Space · Status: effective

Get this as JSONEmbed this
Cite this
Citation
14 CFR 171.25, § 171.25 Minimum requirements for approval, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/58103
Permanent ID
ys:prov:58103@1
SHA-256
e5040c8733503b5b3629fcabf908a899465d95017fb2e4c0d854853d14a87fa6

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

(a) The following are the minimum requirements that must be met before the FAA will approve an IFR procedure for a non-Federal, nondirectional radio beacon facility under this subpart: (1) The facility's performances, as determined by air and ground inspection, must meet the requirements of § 171.27. (2) The installation of the equipment must meet the requirements of § 171.29. (3) The owner must agree to operate and maintain the facility in accord- ance with § 171.31. (4) The owner must agree to furnish periodic reports, as set forth in § 171.33, and agree to allow the FAA to inspect the facility and its operation whenever necessary. (5) The owner must assure the FAA that he will not withdraw the facility from service without the permission of the FAA. (6) The owner must bear all costs of meeting the requirements of this section and of any flight or ground inspections made before the facility is commissioned, except that the Federal Aviation Administration may bear certain of these costs subject to budgetary limitations and policy established by the Administrator. (b) If the applicant for approval meets the requirements of paragraph (a) of this section, the FAA commissions the facility as a prerequisite to its approval for use in an IFR procedure. The approval is withdrawn at any time the facility does not continue to meet those requirements. In addition, the facility may be de-commissioned whenever the frequency channel is needed for higher priority common system service.

Legislative history

This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.