14 CFR 171.43
§ 171.43 Requests for IFR procedure.
United States · 14 CFR — Aeronautics and Space · Status: effective
Cite this
- Citation
- 14 CFR 171.43, § 171.43 Requests for IFR procedure, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/58110
- Permanent ID
ys:prov:58110@1- SHA-256
90657c611ed61942e522dd6c0d087dd50c3d078fd95e778e51c1a47ac81fb8a5
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
(a) Each person who requests an IFR procedure based on an ILS facility that he owns must submit the following information with that request:
(1) A description of the facility and evidence that the equipment meets the performance requirements of § 171.47 and is installed in accordance with § 171.49.
(2) A proposed procedure for operating the facility.
(3) A proposed maintenance organization and a maintenance manual that meets the requirements of § 171.51.
(4) A statement of intent to meet the requirements of this subpart.
(5) A showing that the facility has an acceptable level of operational reliability and an acceptable standard of performance. Previous equivalent operational experience with a facility with identical design and operational characteristics will be considered in showing compliance with this subparagraph.
(b) After the FAA inspects and evaluates the facility, it advises the owner of the results and of any required changes in the facility or the maintenance manual or maintenance organization. The owner must then correct the deficiencies, if any, and operate the facility for an in-service evaluation by the FAA.
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.