yourstate.us
14 CFR 171.257

§ 171.257 Minimum requirements for approval.

United States · 14 CFR — Aeronautics and Space · Status: effective

Get this as JSONEmbed this
Cite this
Citation
14 CFR 171.257, § 171.257 Minimum requirements for approval, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/58152
Permanent ID
ys:prov:58152@1
SHA-256
033373ce127b1649ff8d42dbf9c67e10ce83a925815b4c142d92f53a00e1be27

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

(a) The following are the minimum requirements that must be met before the FAA approves an IFR procedure for a non-Federal ISMLS facility: (1) The performance of the ISMLS facility, as determined by flight and ground inspection conducted by the FAA, must meet the requirements of §§ 171.259, 171.261, 171.263, 171.265, 171.267, and 171.269. (2) The installation of the equipment must meet the requirements of § 171.271. (3) The owner must agree to operate and maintain the ISMLS facility in accordance with § 171.273. (4) The owner must agree to furnish periodic reports as set forth in § 171.275 and agree to allow the FAA to inspect the facility and its operation whenever necessary. (5) The owner must assure the FAA that he will not withdraw the ISMLS facility from service without the permission of the FAA. (6) The owner must bear all costs of meeting the requirements of this section and of any flight or ground inspection made before the ISMLS facility is commissioned, except that the FAA may bear certain costs subject to budgetary limitations and policy established by the Administrator. (b) If the applicant for approval meets the requirements of paragraph (a) of this section, the FAA approves the ISMLS facility for use in an IFR procedure. The approval is withdrawn at any time that the ISMLS facility does not continue to meet those requirements. In addition, the ISMLS facility may be de-commissioned whenever the frequency channel is needed for higher priority common system service.

Legislative history

This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.