§ 437.55 Hazard analysis.
United States · 14 CFR — Aeronautics and Space · Status: effective
Cite this
- Citation
- 14 CFR 437.55, § 437.55 Hazard analysis, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/59751
- Permanent ID
ys:prov:59751@1- SHA-256
cb63d9ff20232c7ea8ac9e66cb978ddc33002a67a162ad55686cf6c9474d7abf
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
(a) A permittee must identify and characterize each of the hazards and assess the risk to public health and safety and the safety of property resulting from each permitted flight. This hazard analysis must—
(1) Identify and describe hazards, including but not limited to each of those that result from—
(i) Component, subsystem, or system failures or faults;
(ii) Software errors;
(iii) Environmental conditions;
(iv) Human errors;
(v) Design inadequacies; or
(vi) Procedural deficiencies.
(2) Determine the likelihood of occurrence and consequence for each hazard before risk elimination or mitigation.
(3) Ensure that the likelihood and consequence of each hazard meet the following criteria through risk elimination and mitigation measures:
(i) The likelihood of any hazardous condition that may cause death or serious injury to the public must be extremely remote.
(ii) The likelihood of any hazardous condition that may cause major property damage to the public, major safety-critical system damage or reduced capability, a significant reduction in safety margins, or a significant increase in crew workload must be remote.
(4) Identify and describe the risk elimination and mitigation measures required to satisfy paragraph (a)(3) of this section. The measures must include one or more of the following:
(i) Designing for minimum risk,
(ii) Incorporating safety devices,
(iii) Providing warning devices, or
(iv) Implementing procedures and training.
(5) Demonstrate that the risk elimination and mitigation measures achieve the risk levels of paragraph (a)(3)(i) of this section through validation and verification. Verification includes:
(i) Test data,
(ii) Inspection results, or
(iii) Analysis.
(b) A permittee must carry out the risk elimination and mitigation measures derived from its hazard analysis.
(c) A permittee must ensure the continued accuracy and validity of its hazard analysis throughout the term of its permit.
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.