Tex. Special District Local Laws Code § 8875.105
PRODUCTION LIMITS AND PERMITS FOR CERTAIN WELLS
Texas · Texas Special District Local Laws Code · Status: effective
Cite this
- Citation
- Tex. Special District Local Laws Code § 8875.105, PRODUCTION LIMITS AND PERMITS FOR CERTAIN WELLS, Texas, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/620887
- Permanent ID
ys:prov:620887@1- SHA-256
af0b80f0afe9ac7996e766adb6a4b3dcfda032c56aca523bffa05b7b69960a22
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
(a) In this section:
(1) "Maximum production capacity" means the rated capacity of a well that is measured in gallons per minute of production as certified by the driller of the well or a professional geologist or engineer.
(2) "Trinity Aquifer" means the Trinity group of aquifers, including the:
(A) Upper Trinity, consisting of the Upper Glen Rose Limestone;
(B) Middle Trinity, consisting of the Lower Glen Rose Limestone, the Hensall Sand, and the Cow Creek Limestone; and
(C) Lower Trinity, consisting of the Sligo Limestone and the Hosston Sand.
(b) Notwithstanding Section 36.117(j), Water Code, the district shall issue to an applicant a permit for a well that is not exempt from permitting and that was drilled into or through the Trinity Aquifer on or before the effective date of the Act enacting this chapter that authorizes the production of the well at an amount not less than the maximum production capacity of the well.
(c) Notwithstanding Section 36.117(j), Water Code, a well that is not exempt from permitting and that was drilled into or through the Trinity Aquifer after the effective date of the Act enacting this chapter requires a permit from the district.