15 CFR 908.6
§ 908.6 Final report.
United States · 15 CFR — Commerce and Foreign Trade · Status: effective
Cite this
- Citation
- 15 CFR 908.6, § 908.6 Final report, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/62561
- Permanent ID
ys:prov:62561@1- SHA-256
8462f4e7feb5e457c00d66cb61c5bfef085c3e2115c1b0db58e3bcb7c55a7efa
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
Upon completion of a weather modification project or activity the person who performed the same shall submit a report to the Administrator not later than 45 days after completion of the project or activity. The report shall include the file number assigned by the Administrator and the following items:
(a) Information required for the interim reports (to the extent not previously reported).
(b) The total number of days on which actual modification activities took place during the project or activity.
(c) The total number of days during the project or activity on which weather modification activities were conducted, segregated by each of the major purposes of the activities.
(d) The total number of hours of operation of each type of weather modification apparatus during the project or activity (i.e., net hours of agent release).
(e) The total amount of modification agent(s) dispensed during the project or activity. If more than one agent was used, each should be totaled separately (e.g., carbon dioxide, sodium chloride, urea, silver iodide).
(f) The date on which the final weather modification activity occurred.
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.