15 CFR 921.12
§ 921.12 Post site selection.
United States · 15 CFR — Commerce and Foreign Trade · Status: effective
Cite this
- Citation
- 15 CFR 921.12, § 921.12 Post site selection, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/62626
- Permanent ID
ys:prov:62626@1- SHA-256
957742da16b5460501e213366d39755a31faa1d9b0a80c3f156d7d054d10638c
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
(a) At the time of the coastal state's request for NOAA approval of a proposed site, the state may submit a request for funds to develop the draft management plan and for preparation of the EIS. At this time, the state may also submit a request for the remainder of the predesignation funds to perform a limited basic characterization of the physical, chemical and biological characteristics of the site approved by NOAA necessary for providing EIS information to NOAA. The state's request for these post site selection funds must be accompanied by the information specified in subpart I and, for draft management plan development and EIS information collection, the following programmatic information:
(1) A draft management plan outline (see § 921.13(a) below); and
(2) An outline of a draft memorandum of understanding (MOU) between the state and NOAA detailing the Federal-state role in Reserve management during the initial period of Federal funding and expressing the state's long-term commitment to operate and manage the Reserve.
(b) The state is eligible to use the funds referenced in § 921.12(a) after the proposed site is approved by NOAA under the terms of § 921.11.
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.