yourstate.us
Tex. Agriculture Code § 201.0227

TEN-YEAR DAM REPAIR AND MAINTENANCE PLAN; REPORTS

Texas · Texas Agriculture Code · Status: effective

Get this as JSONEmbed this
Cite this
Citation
Tex. Agriculture Code § 201.0227, TEN-YEAR DAM REPAIR AND MAINTENANCE PLAN; REPORTS, Texas, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/628567
Permanent ID
ys:prov:628567@1
SHA-256
f1b105d89948dfaba9bf11307beceea04d5afbe2341221e6b25791addc27e6a1

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

(a) In this section: (1) "Plan" means the 10-year dam repair, rehabilitation, and maintenance plan adopted under this section. (2) "Water development board" means the Texas Water Development Board. (b) The state board shall prepare and adopt a plan describing the repair and maintenance needs of flood control dams described by Subsection (c) and prepare and adopt a new plan before the end of the 10th year following the adoption of a plan. (c) The plan must include projects under the jurisdiction of the state board and authorized under: (1) Section 13, Flood Control Act of 1944 (Pub. L. No. 78-534); (2) the pilot watershed program authorized under the Department of Agriculture Appropriation Act, 1954 (Pub. L. No. 83-156); (3) the Watershed Protection and Flood Prevention Act (Pub. L. No. 83-566); and (4) Subtitle H, Title XV, Agriculture and Food Act of 1981 (Pub. L. No. 97-98). (d) The state board shall deliver the plan adopted under this section to the water development board. (d-1) Repealed by Acts 2021, 87th Leg., R.S., Ch. 36 (S.B. 669), Sec. 2, and Acts 2021, 87th Leg., R.S., Ch. 856 (S.B. 800), Sec. 25(1), eff. September 1, 2021. (e) Each year, the state board shall deliver to the water development board a report regarding progress made on items listed in the plan. If an update to the report or plan is necessary before the yearly report or before the end of the 10-year cycle, the state board must deliver to the water development board an amended report or plan. (f) The state board shall consider the timelines for grant applications for the dam structural repair grant program under Section 201.0226 when preparing and adopting a plan under this section.