18 CFR 2.19
§ 2.19 State and Federal comprehensive plans.
United States · 18 CFR — Conservation of Power and Water Resources · Status: effective
Cite this
- Citation
- 18 CFR 2.19, § 2.19 State and Federal comprehensive plans, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/70378
- Permanent ID
ys:prov:70378@1- SHA-256
a79299a4bb5ddc0879c12741731234fb79dd2aa05dd91b343f272bb1141ca3d3
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
(a) In determining whether the proposed hydroelectric project is best adapted to a comprehensive plan under section (10)(a)(1) of the Federal Power Act for improving or developing a waterway, the Commission will consider the extent to which the project is consistent with a comprehensive plan (where one exists) for improving, developing, or conserving a waterway or waterways affected by the project that is prepared by:
(1) An agency established pursuant to Federal law that has the authority to prepare such a plan, or
(2) A state agency, of the state in which the facility is or will be located, authorized to conduct such planning pursuant to state law.
(b) The Commission will treat as a state or Federal comprehensive plan a plan that:
(1) Is a comprehensive study of one or more of the beneficial uses of a waterway or waterways;
(2) Includes a description of the standards applied, the data relied upon, and the methodology used in preparing the plan; and
(3) Is filed with the Secretary of the Commission.
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.