18 CFR 12.42
§ 12.42 Preliminary reports.
United States · 18 CFR — Conservation of Power and Water Resources · Status: effective
Cite this
- Citation
- 18 CFR 12.42, § 12.42 Preliminary reports, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/70646
- Permanent ID
ys:prov:70646@1- SHA-256
e19755c23283d5dbfa1cd5292202e3d9eb713e31576559d79ed09a17984b7f6e
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
At least 30 days prior to the performance of a periodic inspection or comprehensive assessment, a preliminary report prepared by the independent consultant team must be filed by the licensee with the Regional Engineer to document the initial findings, understanding, and preparation of the independent consultant team.
(a) For any periodic inspection, the 30-day period is measured from the scheduled date of the physical field inspection.
(b) For any comprehensive assessment, the 30-day period is measured from the scheduled date of the physical field inspection, potential failure mode analysis, or risk analysis, whichever occurs first.
(c) If the Regional Engineer determines that the preliminary report does not clearly demonstrate that the independent consultant team is adequately prepared for the inspection, the Regional Engineer may require the inspection to be postponed. Any such postponement shall not constitute good cause for an extension of time under § 12.40(d).
(d) If any required supporting team member information was not provided with the independent consultant team proposal required by § 12.34(b), it must be provided with the preliminary report.
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.