18 CFR 32.2
§ 32.2 Required exhibits.
United States · 18 CFR — Conservation of Power and Water Resources · Status: effective
Cite this
- Citation
- 18 CFR 32.2, § 32.2 Required exhibits, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/70704
- Permanent ID
ys:prov:70704@1- SHA-256
ef6f0c2c064dedf224205f9464465051ee77f81ea2b0021047f4068e48089af6
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
There shall be filed with the application and as a part thereof the following exhibits:
Exhibit A. Statement of the estimated capital cost of all facilities required to establish the connection, and the estimated annual cost of operating such facilities.
Exhibit B. A general or key map on a scale not greater than 20 miles to the inch showing, in separate colors, the territory served by each utility, and the location of the facilities used for the generation and transmission of electric energy, indicating on said map the points between which connection may be established most economically.
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.