18 CFR 380.8
§ 380.8 Preparation of environmental documents.
United States · 18 CFR — Conservation of Power and Water Resources · Status: effective
Cite this
- Citation
- 18 CFR 380.8, § 380.8 Preparation of environmental documents, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/71694
- Permanent ID
ys:prov:71694@1- SHA-256
6bea1575d2a6487ec65ee65fa111ca369b3d6e94ad131d1638cc1d54b7dd1502
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
The preparation of environmental documents, as defined in section 111(5) of NEPA, 42 U.S.C. 4336e(5), on hydroelectric projects, natural gas facilities, and electric transmission facilities in national interest electric transmission corridors is the responsibility of the Commission's Office of Energy Projects, 888 First Street NE, Washington, DC 20426, (202) 502-8700. Persons interested in status reports or information on environmental impact statements or other elements of the NEPA process, including the studies or other information the Commission may require on these projects, can contact this office.
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.