yourstate.us
18 CFR 415.43

§ 415.43 Mapped and unmapped delineations.

United States · 18 CFR — Conservation of Power and Water Resources · Status: effective

Get this as JSONEmbed this
Cite this
Citation
18 CFR 415.43, § 415.43 Mapped and unmapped delineations, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/72054
Permanent ID
ys:prov:72054@1
SHA-256
5a4ff70fb64505de50986e2c69560b83fa789f2400f066558b51e71547e0d324

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

(a) Whenever an official flood plain map providing the pertinent information is available with respect to a given project, the map shall be used for the delineation of the flood hazard area, floodway, flood fringe and determination of flood protection elevation. (b) Whenever an official flood plain map providing the required information is not available with respect to a given project, the administrative agency shall require the project landowner to submit details concerning the proposed uses as needed to determine the floodway and flood fringe limits at the proposed site, including: cross-sections of the stream channel and overbanks, stream profile, and factors involved in determining obstructions to flow. From the data submitted, soil surveys, historic flood maps, high water marks and other empirical data, the applicant, subject to verification by the administrative agency, shall calculate flood hazard areas, and establish the flood protection elevation for the particular site. (c) Pending the preparation and completion of flood plain mapping, a “general flood plain” area shall be prescribed by the administrative agency to delineate for public guidance the areal limits of site locations which are required to be submitted for review under this regulation.

Legislative history

This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.