Cal. Public Contract Code § 6702

Cal. Public Contract Code § 6702

California · California Public Contract Code · Status: effective · Effective 2020-01-01

Get this as JSONEmbed this
Cite this
Citation
Cal. Public Contract Code § 6702, California, version 1 as recorded 2026-07-25, yourstate.us, https://yourstate.us/provision/896151
Permanent ID
ys:prov:896151@1
SHA-256
d1b190bf279dd83040ac9b5a0482664dd8bb3e507f0e80ccd66ec9379947d0ae

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

As used in this chapter, the following terms have the following meanings: (a) “Construction manager” means a partnership, corporation, or other legal entity that is a licensed contractor pursuant to Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code and that is able to provide, or that contracts with entities that are able to provide, appropriately licensed contracting or engineering services, or both appropriately licensed contracting and engineering services, as needed pursuant to a Construction Manager/General Contractor method contract. (b) “Construction Manager/General Contractor method” means a project delivery method in which a construction manager is procured to provide preconstruction services during the design phase of the project and construction services during the construction phase of the project. The contract for construction services may be entered into at the same time as the contract for preconstruction services, or at a later time. The execution of the design and the construction of the project may be in sequential phases or concurrent phases. (c) “Department” means the Department of Transportation as established under Part 5 (commencing with Section 14000) of Division 3 of Title 2 of the Government Code. (d) “Preconstruction services” means advice during the design phase including, but not limited to, scheduling, pricing, and phasing to assist the department to design a more constructible project. (e) “Project” means the construction of a highway, bridge, or tunnel.