Cal. Public Contract Code § 6950
Cal. Public Contract Code § 6950
California · California Public Contract Code · Status: effective · Effective 2013-01-01
Cite this
- Citation
- Cal. Public Contract Code § 6950, California, version 1 as recorded 2026-07-25, yourstate.us, https://yourstate.us/provision/896171
- Permanent ID
ys:prov:896171@1- SHA-256
f7a77085ac148a51444bb86bd39ab8cc6b9c5cb9c39b83d65fc5bc926ba995d1
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
The Legislature finds and declares all of the following:
(a) The alternative public works project delivery methods authorized under this chapter should be evaluated for the purposes of exploring whether the potential exists for reduced project costs, expedited project completion, or design features that are not achievable through the traditional project delivery methods.
(b) The design sequencing and Construction Manager/General Contractor project delivery methods rely on existing design-bid-build and design-build procurement methods respectively and have been successfully used by both public and private sector entities in California and other states for over a decade on projects that require a quick startup as they allow construction to begin before the design plans are complete for the entire project.
(c) Both methods also have the benefit of allowing for earlier collaboration between the project owner and construction contractor.
(d) This chapter shall not be deemed to provide a preference for these project delivery methods over other delivery methodologies.