yourstate.us
Cal. Public Contract Code § 6970

Cal. Public Contract Code § 6970

California · California Public Contract Code · Status: effective · Effective 2016-01-01

Get this as JSONEmbed this
Cite this
Citation
Cal. Public Contract Code § 6970, California, version 1 as recorded 2026-07-25, yourstate.us, https://yourstate.us/provision/896181
Permanent ID
ys:prov:896181@1
SHA-256
1a6bb6c82d033e6c7c1a44694199169b318a5a7e362b4c08ea74d02a6d0a6fa5

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

(a) This chapter provides for an alternative procurement procedure for certain transportation projects performed by a regional transportation agency. (b) The Construction Manager/General Contractor method allows the regional transportation agency to engage a construction manager during the design process to provide input on the design. During the design phase, the construction manager provides advice including, but not limited to, scheduling, pricing, and phasing to assist the agency to design a more constructible project. (c) The Legislature finds and declares that utilizing a Construction Manager/General Contractor method requires a clear understanding of the roles and responsibilities of each participant in the process. The Legislature also finds and declares that cost-effective benefits are achieved by shifting the liability and risk for cost containment and project schedule to the construction manager and by permitting the coherent phasing of projects into discrete contract increments.