yourstate.us
Cal. Public Resources Code § 8813.1

Cal. Public Resources Code § 8813.1

California · California Public Resources Code · Status: effective · Effective 2023-01-01

Get this as JSONEmbed this
Cite this
Citation
Cal. Public Resources Code § 8813.1, California, version 1 as recorded 2026-07-25, yourstate.us, https://yourstate.us/provision/901667
Permanent ID
ys:prov:901667@1
SHA-256
4ad0eaebb77ae43fea64ea5f3d21529fc2d4f8dcca75d8227344dcd066532032

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

On and after December 31, 2005, a survey that uses or establishes a CCS83 value or values shall meet all of the following requirements: (a) (1) The survey shall be referenced to and shall have field-observed statistically independent connections to one or more horizontal reference stations, except as provided in paragraph (2), that is or are one of the following: (A) CSRN station. (B) Geodetic control station located outside of the State of California that meets all the requirements for inclusion in the CSRN except that the station is outside California. (C) Existing CCS83 station that is all of the following: (i) Is shown on a map filed with the applicable county surveyor by a public officer, subdivision map, corner record, or record of survey. (ii) Meets all the requirements for inclusion in the CSRN, except that the station and its data are not published by NGS or CSRC. (iii) Has an accuracy, conforming to the applicable CSRN requirements, stated for the station’s value. (D) Existing CCS83 station that is all of the following: (i) Is shown on a public map or document that is compiled and maintained by the applicable county surveyor. (ii) Meets all the requirements for inclusion in the CSRN, except that the station and its data are not published by NGS or CSRC. (iii) Has an accuracy, conforming to the applicable CSRN requirements, stated for the station’s value. (2) On and after January 1, 2023, for purposes of a survey that establishes a CCS83 value or values, the survey shall be referenced to and shall have field-observed statistically independent connections to two or more horizontal reference stations. (b) If an accuracy is to be claimed for the CCS83 value or values established, the claimed accuracy shall be an accuracy standard published by FGDC or FGCS.