Cal. Public Utilities Code § 2780.1
Cal. Public Utilities Code § 2780.1
California · California Public Utilities Code · Status: effective · Effective 2005-01-01
Cite this
- Citation
- Cal. Public Utilities Code § 2780.1, California, version 1 as recorded 2026-07-25, yourstate.us, https://yourstate.us/provision/908730
- Permanent ID
ys:prov:908730@1- SHA-256
fae62acd26774794fa05b0ee120adf8ed7ceefad5081e3313ca0721af7481f78
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
(a) It is the intent of the Legislature that the commission consider the legal, administrative, and operational costs that an electric microutility faces if it is named as a respondent in a hearing generally applicable to electrical corporations. The limited resources of a microutility are disproportionately strained by the cost of response.
(b) Further, it is the intent of the Legislature that the commission consider the costs described in subdivision (a) before naming an electric microutility as a respondent in a hearing generally applicable to electrical corporations.