yourstate.us
Cal. Streets and Highways Code § 217

Cal. Streets and Highways Code § 217

California · California Streets and Highways Code · Status: effective · Effective 2023-07-10

Get this as JSONEmbed this
Cite this
Citation
Cal. Streets and Highways Code § 217, California, version 1 as recorded 2026-07-25, yourstate.us, https://yourstate.us/provision/925113
Permanent ID
ys:prov:925113@1
SHA-256
85cb36a8d91adf2ed8d4aa404f3a2a6cab17e697da178ff96ca76208d2bf0ae0

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

As used in this article, the following definitions apply: (a) “Adjustment factor“ means the job order contractor’s competitively bid adjustment to the department’s prices as published in the unit price catalog. (b) “Job order” means a firm, fixed-priced, lump-sum order issued by the department to a job order contractor for a definite project scope or work as compiled from the unit price catalog to be performed pursuant to a job order contract. (c) “Job order” means a contract, awarded pursuant to this section, between the department and a licensed, bonded, and general liability insured contractor in which the contractor agrees to a fixed-period, fixed-unit price, and indefinite quantity contract that provides for the use of job orders for public works or maintenance projects. (d) “Project” means the specific requirements and work to be accomplished by the job order contractor in connection with an individual job order. (e) “Unit price catalog” means a book containing specific construction tasks and the unit prices to install or demolish that construction. The listed tasks shall be based on generally accepted industry standards and information, where available, for various items of work to be performed by the job order contractor. The prices shall include the cost of materials, labor, and equipment for performing the items of work. The prices shall not include overhead and profit. All unit prices shall be developed using local prevailing wages.