yourstate.us
Cal. Water Code § 138.10

Cal. Water Code § 138.10

California · California Water Code · Status: effective · Effective 2005-01-01

Get this as JSONEmbed this
Cite this
Citation
Cal. Water Code § 138.10, California, version 1 as recorded 2026-07-25, yourstate.us, https://yourstate.us/provision/935484
Permanent ID
ys:prov:935484@1
SHA-256
e36c695518544c7163853ad7aef997a97a5a791ba5b5ad2f5c91f91321255e12

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

(a) On or before January 1, 2006, the director, in collaboration with the Secretary of Interior or his or her designee, shall prepare a plan to meet the existing permit and license conditions for which the department has an obligation, as described in the State Water Resources Control Board Decision No. 1641. (b) The plan shall be designed to achieve compliance with the permit and license conditions described in subdivision (a). The director shall prepare the plan, and submit copies of the plan to the board and the California Bay-Delta Authority, prior to increasing the existing permitted diversion rate at the State Water Project’s Harvey O. Banks Pumping Plant. (c) Nothing in this section limits or restricts the department in its operation of the State Water Project due to failure of other water rights permittees or licensees to meet water quality conditions of their respective permits or licenses.