Cal. Water Code § 1250.5
Cal. Water Code § 1250.5
California · California Water Code · Status: effective · Effective 1982-09-28
Cite this
- Citation
- Cal. Water Code § 1250.5, California, version 1 as recorded 2026-07-25, yourstate.us, https://yourstate.us/provision/935902
- Permanent ID
ys:prov:935902@1- SHA-256
05d6390d21ad2e0aa313c8c0811a585fcbd5a44b4dd1e9a2fd5cb9360090aaee
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
The board shall consider and act upon all applications for permits to appropriate water which propose, as a primary purpose of the application, the development of small hydroelectric energy facilities at an existing dam, canal, or conduit, up to and including 30 megawatts, or the development of any other hydroelectric facility with a generating capacity of five megawatts or less, within one year from the date a complete application and an instream beneficial use assessment have been filed with the board, except that the assessment need not be filed if the streamflow regime will not be changed, and except that final board action may be continued for a reasonable time not to exceed one year upon the request of the applicant or upon a finding by the board that the additional time is necessary to determine (1) if unappropriated water is available or (2) the effect upon instream uses.