Cal. Water Code § 12650
Cal. Water Code § 12650
California · California Water Code · Status: effective
Cite this
- Citation
- Cal. Water Code § 12650, California, version 1 as recorded 2026-07-25, yourstate.us, https://yourstate.us/provision/938540
- Permanent ID
ys:prov:938540@1- SHA-256
aa32561bf1e652c3c0afc7a9a504a4fab7712cb2dee5ae1a97f7c88d8f6fa0c0
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
The plan of improvement for flood protection on various streams in the Merced County Stream Group in the San Joaquin Valley is adopted and authorized substantially in accordance with recommendations of the Chief of Engineers in House Document Numbered 473, Seventy-eighth Congress, Second Session, at an estimated cost to the State of sixty-one thousand three hundred dollars ($61,300).
Notwithstanding any estimated cost to the State contained in this section, local cooperation which shall be furnished by the State in connection with the plan of improvement for flood protection on various streams in the Merced County Stream Group in the San Joaquin Valley, adopted and authorized under this section shall include, without limitation as to the generality thereof:
(a) Enlargement of the channel of Miles Creek to the extent indicated on Inclosure 3 of House Document Numbered 473, Seventy-eighth Congress, Second Session.
(b) Acquisition of lands, easements and rights of way necessary for construction of the following diversions to the capacities indicated:
(1) Owens Creek Diversion, 400 cubic feet per second.
(2) Black Rascal Diversion, 3,000 cubic feet per second.
(c) Providing the following channel capacities of the various creeks:
(1) Burns Creek: 2,000 cubic feet per second on Burns Creek from its confluence with Bear Creek upstream to the section line common to Sections 3 and 10, T. 7 S., R. 15 E., M. D. B. & M.
(2) Bear Creek: 2,000 cubic feet per second from its confluence with Burns Creek upstream to the section line common to Sections 11 and 12, T. 7 S., R. 15 E., M. D. B. & M.; 4,000 cubic feet per second from its confluence with Black Rascal Creek Diversion upstream to its confluence with Burns Creek; 7,000 cubic feet per second from its confluence with the head of Black Rascal Slough to the Black Rascal Creek Diversion; not less than 3,100 cubic feet per second from its confluence with the lower end of Black Rascal Slough to the confluence with the head of Black Rascal Slough, so that the combined capacity of Bear Creek and Black Rascal Slough is not less than 7,000 cubic feet per second; 7,000 cubic feet per second from the section line common to Sections 2 and 3, T. 8 S., R. 12 E., M. D. B. & M., upstream to the confluence of Bear Creek with the lower end of Black Rascal Slough.
(3) Black Rascal Slough: Not less than 3,900 cubic feet per second and so that the combined capacity of Black Rascal Slough and Bear Creek is not less than 7,000 cubic feet per second.
(4) Miles Creek: 1,000 cubic feet per second from the Merced-El Nido Highway upstream to the section line common to Sections 25 and 26, T. 7 S., R. 15 E., M. D. B. & M.
(5) Owens Creek: 400 cubic feet per second from Owens Creek Diversion to the bridge crossing at the section line common to Sections 29 and 30, T. 7 S., R. 16 E., M. D. B. & M.
(6) Mariposa Creek: 1,000 cubic feet per second from Owens Creek Diversion upstream to the bridge located in SW. 14 of Section 10, T. 8 S., R. 16 E., M. D. B. & M.; 1,250 cubic feet per second from El Nido Highway upstream to Owens Creek Diversion.