23 CFR 635.113
§ 635.113 Bid opening and bid tabulations.
United States · 23 CFR — Highways · Status: effective
Cite this
- Citation
- 23 CFR 635.113, § 635.113 Bid opening and bid tabulations, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/96858
- Permanent ID
ys:prov:96858@1- SHA-256
911ce0bb828279782a44e84bbd32d0c3ee3a89a550ab7b67f43b8165a666fbf3
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
(a) All bids received in accordance with the terms of the advertisement shall be publicly opened and announced either item by item or by total amount. If any bid received is not read aloud, the name of the bidder and the reason for not reading the bid aloud shall be publicly announced at the letting. Negotiation with contractors, during the period following the opening of bids and before the award of the contract shall not be permitted.
(b) The State DOT shall prepare and forward tabulations of bids to the Division Administrator. These tabulations shall be certified by a responsible State DOT official and shall show:
(1) Bid item details for at least the low three acceptable bids and
(2) The total amounts of all other acceptable bids.
(c) In the case of a design-build project, the following requirements apply:
(1) All proposals received must be opened and reviewed in accordance with the terms of the solicitation. The State DOT must use its own procedures for the following:
(i) The process of handling proposals and information;
(ii) The review and evaluation of proposals;
(iii) The submission, modification, revision and withdrawal of proposals; and
(iv) The announcement of the successful offeror.
(2) The State DOT must submit a post-award tabulation of proposal prices to the FHWA Division Administrator. The tabulation of price proposal information may include detailed pricing information when available or lump sum price information if itemized prices are not used.
(d) In the case of a CM/GC project, the requirements of this section do not apply. See subpart E of this part for approval procedures.
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.