23 CFR 636.201
§ 636.201 What selection procedures and award criteria may be used?
United States · 23 CFR — Highways · Status: effective
Cite this
- Citation
- 23 CFR 636.201, § 636.201 What selection procedures and award criteria may be used?, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/96932
- Permanent ID
ys:prov:96932@1- SHA-256
5efda4a859afe11e302776ac1a601c66917fb164bd672760bb145e152d25edf3
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
You should consider using two-phase selection procedures for all design-build projects. However, if you do not believe two-phase selection procedures are appropriate for your project (based on the criteria in § 636.202), you may use a single phase selection procedure or the modified-design-build contracting method. The following procedures are available:
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.