§ 636.202 When are two-phase design-build selection procedures appropriate?

United States · 23 CFR — Highways · Status: effective

Get this as JSONEmbed this
Cite this
Citation
23 CFR 636.202, § 636.202 When are two-phase design-build selection procedures appropriate?, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/96933
Permanent ID
ys:prov:96933@1
SHA-256
ddb2ce74288bc8ec5936e7099e054f59a27375b55bf515913b39ec0fd04aa5e7

The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.

Full text

You may consider the following criteria in deciding whether two-phase selection procedures are appropriate. A negative response may indicate that two-phase selection procedures are not appropriate. (a) Are three or more offers anticipated? (b) Will offerors be expected to perform substantial design work before developing price proposals? (c) Will offerors incur a substantial expense in preparing proposals? (d) Have you identified and analyzed other contributing factors, including: (1) The extent to which you have defined the project requirements? (2) The time constraints for delivery of the project? (3) The capability and experience of potential contractors? (4) Your capability to manage the two-phase selection process? (5) Other criteria that you may consider appropriate?