23 CFR 668.213
§ 668.213 Application procedures.
United States · 23 CFR — Highways · Status: effective
Cite this
- Citation
- 23 CFR 668.213, § 668.213 Application procedures, United States, version 1 as recorded 2026-07-09, yourstate.us, https://yourstate.us/provision/97192
- Permanent ID
ys:prov:97192@1- SHA-256
d559913d972aa0452d7f158d55b250f0a6ccf95220c7a199b89b93d954e9cdf0
The hash is SHA-256 of this version's text, with every run of whitespace collapsed to a single space and the ends trimmed. The ID always leads back here, and checking it says whether the text you cited is still the current version.
Full text
(a) Based on the detailed site inspections and damage estimates prepared pursuant to paragraph (e) of § 668.211, the applicant will submit an application in the form of a letter to the DFDE which shall include a list of projects for which emergency relief is requested. The application shall be submitted within 3 months after an Affirmative Finding.
(b) The list of projects shall include emergency repairs, PE, and permanent work, and provide for each project a location, length, project number, type of damage, description of work with a separate breakdown for betterments including a justification for those intended for emergency relief funding, proposed method of construction, estimated cost, and any other information requested by the DFDE.
(c) If the initial list of projects is incomplete, a subsequent list(s) of projects shall be forwarded to the DFDE for approval consideration as soon as possible.
Legislative history
This is a federal regulation, adopted through agency rulemaking under the Administrative Procedure Act — not enacted by a recorded vote of Congress.